Zerion solution

Fibre optic & FTTx

From route survey to maintenance, Zerion takes charge of your optical infrastructure: FTTH/FTTB access networks, enterprise connections and backbone links, with complete measurements and documentation.

Scope of work

What we take care of.

01

Studies & engineering

Route survey, capacity design, bill of quantities, execution drawings and civil-works constraint analysis.

02

Field deployment

Cable pulling, blowing or aerial installation, chamber management and mechanical cable protection.

03

Splicing & testing

Fusion splicing, OTDR and optical-power measurements, fault location and abnormal-loss correction.

04

Acceptance & maintenance

As-built drawings, measurement reports, acceptance records and preventive-maintenance programme.

Deliverables

What you receive.

Every intervention is documented to simplify acceptance, operations and future changes.

  • Route records and execution drawings
  • OTDR traces and power budgets for each link
  • As-built drawings and closure and patch-panel records
  • Acceptance file and handover certificate
  • Maintenance intervention reports

Environments

Which sites?

Operators and ISPs

Deployment and maintenance of FTTH/FTTB access networks.

Enterprises and campuses

Building connections and links between nearby sites.

Backbone

Construction and maintenance of long-distance links.

How we work

From requirement to operational infrastructure.

  1. 01

    Understand

    Sites, uses, constraints and service levels.

  2. 02

    Design

    Architecture, budget, risk and deployment plan.

  3. 03

    Deploy

    Logistics, installation, testing and commissioning.

  4. 04

    Accept

    Measurements, training, as-built files and approval.

  5. 05

    Maintain

    Support, prevention and continuous improvement.

Frequently asked questions

Fibre optic & FTTx: your questions.

Do you handle corrective maintenance?

Yes: fault location, repair, new measurements and updated documentation.

Can you take over an existing fibre network?

Yes. We start with an inventory, baseline measurements and a gap analysis against the existing documentation.

Do you follow the operator’s procedures?

Yes: report formats, naming conventions, HSE rules and acceptance procedures are aligned with the client’s requirements.

Your project

Get an initial technical assessment.

Describe your sites, constraints and timeline. Response within one business day, no obligation.