Zerion solution

Power & civil works

Zerion prepares the physical environment of your infrastructure: civil works, power distribution, backup power and grounding, so critical equipment runs reliably over time.

Scope of work

What we take care of.

01

Civil works

Trenches, ducts, chambers, plinths, supports, fencing and reinstatement of surfaces.

02

Power distribution

Panels, protection, cabling, selectivity, distribution and electrical preparation of critical loads.

03

Backup power

Sizing and integration of UPS systems, batteries, transfer switches and backup power sources.

04

Grounding & protection

Earthing network, bonding, surge protection, resistance testing and documented results.

Deliverables

What you receive.

Every intervention is documented to simplify acceptance, operations and future changes.

  • Power budget and autonomy sizing
  • Civil-works drawings and bill of quantities
  • Up-to-date electrical diagrams
  • Earth resistance measurements and report
  • Commissioning certificate

Environments

Which sites?

Telecom sites

Power, grounding and lightning protection for technical sites.

Technical rooms

Distribution, UPS and power continuity.

Fibre projects

Civil works associated with optical deployments.

How we work

From requirement to operational infrastructure.

  1. 01

    Understand

    Sites, uses, constraints and service levels.

  2. 02

    Design

    Architecture, budget, risk and deployment plan.

  3. 03

    Deploy

    Logistics, installation, testing and commissioning.

  4. 04

    Accept

    Measurements, training, as-built files and approval.

  5. 05

    Maintain

    Support, prevention and continuous improvement.

Frequently asked questions

Power & civil works: your questions.

How do you size backup autonomy?

From a load assessment, the quality of the local power grid and the autonomy your operations require.

Can you test an existing grounding system?

Yes: measurements, report and recommendations for bringing it up to standard where needed.

Do you carry out civil works on their own?

Yes, as a separate package or as part of a fibre, telecom site or technical room project.

Your project

Get an initial technical assessment.

Describe your sites, constraints and timeline. Response within one business day, no obligation.